|
200
Ton LIFTING BEAM FABRICATION cont.
(Left)
Mike S. lays out the lifting lugs prior
to welding. These parts will be full penetration
welded to the lug side plates. These trunnions
are 11" in diameter. The plates are
2" plate.
(Below) The plates and trunnions are tack
welded in place. Mike starts the welding
on a weld positioner.
|